Iron Bridge Magnetite Project



Contact Details


Linus O'Brien
+61 8 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Project Execution Phase
  Project Owner IB OPERATIONS PTY LTD

Project Details


Project owner: IB Operations Pty Ltd, as agent for Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd


Project Details:

The Iron Bridge Magnetite Project (Project) is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron Bridge site comprises the North Star, Eastern Limb, Glacier Valley and West Star magnetite iron ore deposits, located 145km south of Port Hedland.  

Delivery of first ore is expected in the first half of calendar year 2022, with ramp up to full production within 12 months.

IB Operations is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the ICN Gateway. 


Scope Overview:

The Project scope will require the establishment of new facilities, including:

·         mine

·         ore processing facility

·         slurry and return water pipeline

·         raw water pipeline

·         port infrastructure

·         non-process infrastructure, such as airstrip, village extension, telecommunications networks, electricity, water, sewage, and wastewater facilities. 


The Iron Bridge Project will be operated by IB Operations Pty Ltd, as agent for the Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd.  IB Operations Pty Ltd is an Australian private company, which is owned by FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd, each a participant in the unincorporated Iron Bridge Joint Venture.


Local and Indigenous participation:


In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for the Iron Bridge Magnetite Project tendering opportunities.

SHOW LESS

Associated Opportunities


SHOW MORE

Work Packages


There are currently no open work packages for this project.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Coarse Ore Stockpile Radial Stacker 

Full scope has been awarded to:

THYSSENKRUPP INDUSTRIAL SOLUTIONS (AUSTRALIA) PTY LTD

Awarded Information for 662NSP2008 - Radial Stacker:-

Sub-contracting opportunities:
Name: Richard Edwards
Position: Head of Procurement
Phone Number: 0428 284 792
Email Address: Richard.edwards@thyssenkrupp.com
Address: L11, 141 St Georges Tce Perth

Employment opportunities:
Name: Valentina Vujacic
Position: Manager, Human Resources
Phone Number: 08 9200 0000
Email Address: JOBS-IS-Australia@thyssenkrupp.com
Address: L11, 140 St Georges Terrace Perth, WA 6000

Please review the scope of works document for details of the package.
Concentrate Belt Filters 

Full scope has been awarded to:

Jord International Pty Ltd

Sub-contracting opportunities:
Name: Samir Kher
Position: Commercial Manager
Phone Number: +61 2 8425 1500
Email Address: skher@jord.com.au

Employment opportunities:
Name: Erin Collins
Position: Group Human Resources Manager
Phone Number: +61 2 8425 1584
Email Address: ecollins@jord.com.au
Address: Jord International Ltd Pty
40 Oxley Street, St Leonards, NSW 2065.

Please refer to the scope of works for details of the package
Slurry Process Sump Pumps 

Full scope has been awarded to:

WEIR Pty Ltd

Sub-contracting opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Employment opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Please refer to scope of works for further details pertaining to this package.
Bulk Earthworks Detailed Earthworks and Concrete for the Roads Processing Plant and Infrastructure 

Full scope has been awarded to:

NRW Pty Ltd

Sub-contracting opportunities:
Name: Lisa Branford
Position: Principal Engineer
Phone Number: (08) 9232 4200
Email Address: tendering@nrw.com.au
Address: 181 Great Eastern Highway, Belmont WA 6104

Employment opportunities:
Name: Jen Burdach
Position: Recruitment Advisor
Phone Number: (08) 9232 4200
Email Address: recruitment@nrw.com.au
Address: 181 Great Eastern Highway, Belmont WA 6104

Please refer to the scope of works for further information pertaining to the package.
Demagnetizing Coils 

Full scope has been awarded to:

Eriez Magnetics Pty Ltd

Sub-contracting opportunities:
Name: Dennis Ng
Position: Business Development Engineer
Phone Number: 03 8401 7400
Email Address: dng@eriez.com
Address: 21 Shirley Way, Epping, VIC 3076

Employment opportunities:
Name: Jason Poole
Position: Factory Manager
Phone Number: 03 8401 7400
Email Address: jpoole@eriez.com
Address: 21 Shirley Way, Epping, VIC 3076

please refer to teh scope of works document for details of teh package
Hydrocyclones 

Full scope has been awarded to:

Weir Minerals

Sub-contracting opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Employment opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Please refer to scope of work for further details pertaining to this package.
Agitators 

Full scope has been awarded to:

Mixtec Solutions Pty Ltd

Sub-contracting opportunities:
Name: Parag Dharkar
Position: Lead Engineer
Phone Number: +61 8 9249 2944
Email Address: Parag.dharkar@mixtec.com.au
Address: 46 Millrose Drive, Malaga, WA-6090

Employment opportunities:
Name: Parag Dharkar
Position: Lead Engineer
Phone Number: +61 8 9249 2944
Email Address: Parag.dharkar@mixtec.com.au
Address: 46 Millrose Drive, Malaga, WA-6090

Please refer to scope of work for further details pertaining to this package.
Slurry Samplers 

Full scope has been awarded to:

Outotec Pty Ltd

Sub-contracting opportunities:
Name: Gary Reinwald
Position: Project Manager, CAPEX
Phone Number: +61 3 9904 1600
Email Address: gary.reinwald@outotec.com
Address: 12 Kitchen Road Dandenong South VIC 3175 Australia

Employment opportunities:
Name: Jessica Luc
Position: Director of Human Resources - South East Asia Pacific
Phone Number: (02) 9984 2500
Email Address: Jessica.luc@outotec.com
Address: 20 Rodborough Road Frenchs Forest NSW
2068 Australia

Please refer to the scope of works document for details of the package
Static Trash Screens 

Full scope has been awarded to:

Multotec Pty Ltd

Sub-contracting opportunities:
Name: Luka Vasev
Position: Project Manager
Phone Number: 0417221599
Email Address: luka.vasev@multotec.com.au
Address: 24 Volcanic Loop Wangara 6065

Employment opportunities:
Name: Daniela Adams
Position: Process Engineer
Phone Number: 0439042327
Email Address: daniela.adams@multotec.com.au
Address: 24 Volcanic Loop Wangara 6065

Please refer to scope of work for further details pertaining to this package.
Conveyor Drives 

Full scope has been awarded to:

Flender Pty Ltd

Sub-contracting opportunities:
Name: Shardul Kulkarni
Position: Strategic Procurement
Phone Number: +61 (2) 9491-5049
Email Address: shardul.kulkarni@flender.com
Address: 160 Herring Rd, Macquarie Park NSW 2113

Employment opportunities:
Name: Julia Benedikt
Position: HR Manager
Email Address: julia.benedikt@flender.com
Address: 160 Herring Rd, Macquarie Park NSW 2113

Please refer to scope of work for further information pertaining to this package.
Cranes and Hoists 

Full scope has been awarded to:

Eilbeck Cranes Pty Ltd

Sub-contracting opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Employment opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Please refer to SOW for further details pertaining to this package.
Take-Up Equipment 

Full scope has been awarded to:

Eilbeck Cranes Pty Ltd

Sub-contracting opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Employment opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Please refer to SOW for further details pertaining to this package.
Conveyor Belt Covers 

Full scope has been awarded to:

Kinder Australia Pty Ltd

Information in relation to Award:-

Sub-contracting opportunities:
Name: Cameron Portelli
Position: Senior Mechanical Engineer
Phone Number: + 61 3 8587 9101
Email Address: cameronp@kinder.com.au
Address: 26 Canterbury Road, Braeside VIC 3195

Employment opportunities:
Name: Cameron Portelli
Position: Senior Mechanical Engineer
Phone Number: + 61 3 8587 9101
Email Address: cameronp@kinder.com.au
Address: 26 Canterbury Road, Braeside VIC 3195

Please refer to the Scope of works document for details of the package.
Conveyor Belt Cleaners 

Full scope has been awarded to:

TS Global Pty Ltd

Sub-contracting opportunities:
Name: Jamie Whybrow
Position: Contract Manager
Phone Number: 0431 604 022
Email Address: jwhybrow@tsglobal.net.au
Address: 8 Laurio Place, Mayfield West, NSW, 2304

Employment opportunities:
Name: Jamie Whybrow
Position: Contract Manager
Phone Number: 0431 604 022
Email Address: jwhybrow@tsglobal.net.au
Address: 8 Laurio Place, Mayfield West, NSW, 2304

Please refer to SOW for further details pertaining to this package.
Bulk Earthworks - Access Roads and Infrastructure03 Apr 201924 Apr 201924 Apr 2019
Please refer to scope of works document for details on the scope of works
GEOTECHNICAL SERVICES05 Apr 201926 Apr 201926 Apr 2019
please refer to the scope of works document for details of the package
Mine Fleet05 Apr 201926 Apr 201926 Apr 2019
Please refer to the scope of works for details of the package package
Airport11 Apr 201902 May 201902 May 2019
Please review the scope of works document for details of the package.
High Pressure Grinding Rollers11 Apr 201902 May 201902 May 2019
Please review the scope of works for details of the package.
Operations Camp18 Apr 201909 May 201909 May 2019
please refer to the scope of works document for details of the package
Regrind Mills26 Apr 201917 May 201917 May 2019
Please review the scope of works document for details of the package.
Air Classifier01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Bridge Reclaimer01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Cone Crushers01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Dry Rejects Conveying System01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Gyratory Crushers01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Product Baghouse01 May 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Steel Thickeners07 May 201928 May 201928 May 2019
Please refer to the scope of works document for details of the package
Water Pumps07 May 201928 May 201928 May 2019
Please refer to the scope of works for details of the package
Concrete Thickeners07 May 201928 May 201929 May 2019
Please refer to the scope of works document for details on the package
Survey and Set Out09 May 201931 May 201931 May 2019
Please refer to scope of works for further details of the package.
Dry Magnetic Separators14 May 201905 Jun 201905 Jun 2019
Please refer to scope of works for further details.
Dust Collection Systems14 May 201905 Jun 201905 Jun 2019
Please refer to scope of works for further details on package.
PROCESS PLANT CONSTRUCTION21 May 201911 Jun 201911 Jun 2019
Please refer to the scope of works for details of the package
Canning Basin Bore Hole Drilling21 May 201914 Jun 201914 Jun 2019
Please refer to the scope of works for further details on this package.
Tertiary Grinding Wet Screening24 May 201917 Jun 201917 Jun 2019
Please refer to scope of works for further details pertaining to the work.
Dewatering Drums28 May 201919 Jun 201919 Jun 2019
Please refer to the scope of work for further details pertaining to the package.
Positive Displacement Pumps29 May 201919 Jun 201919 Jun 2019
Please refer to scope of work for further details pertaining to this package.
Wet Magnetic Separators28 May 201919 Jun 201919 Jun 2019
Please refer to scope of works for further details pertaining to this package.
Vibrating Screens10 Jun 201901 Jul 201901 Jul 2019
Please refer to scope of works for further details pertaining to this package.
Apron Feeders24 Jun 201915 Jul 201915 Jul 2019
Please refer to the scope of works for details of the package
Bulk Earthworks Tailings Storage Facility27 Jun 201919 Jul 201919 Jul 2019
Please refer to the scope of works document for details of the package
MV/HV Variable Speed Drives04 Jul 201925 Jul 201925 Jul 2019
Please refer to scope of works for further information pertaining to this work.
Pipelines Basic and Detailed Design04 Jul 201925 Jul 201925 Jul 2019
Please refer to scope of work for further details pertaining to this package.
Hydro-Separation Tanks05 Jul 201926 Jul 201926 Jul 2019
Please refer to scope of works for further details on this package.
Construction Water Supply18 Jul 201908 Aug 201908 Aug 2019
Please refer to scope of work for further details pertaining to this work.
WASTE WATER TREATMENT PLANT17 Jul 201908 Aug 201908 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Water Treatment Plant17 Jul 201908 Aug 201908 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Belt Feeders22 Jul 201912 Aug 201912 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Explosives Supply and Services25 Jul 201915 Aug 201915 Aug 2019
Please refer to scope of work for further information pertaining to this package.
Waste Management26 Jul 201916 Aug 201916 Aug 2019
Please refer to scope of work for further details on this package.
Dart Valves29 Jul 201919 Aug 201919 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Polishing Filters01 Aug 201922 Aug 201922 Aug 2019
Please refer to scope of work for further details pertaining to this package.
LV Variable Speed Drives - Field Mounted05 Aug 201926 Aug 201926 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Coagulant Plant05 Aug 201927 Aug 201927 Aug 2019
Please refer to the scope of works document for details of the package
Flocculant Plant05 Aug 201927 Aug 201927 Aug 2019
Please refer to the scope of works document for details of the package
Bulk Earthworks - PORT07 Aug 201928 Aug 201928 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Water Supply - Local Borefield Development07 Aug 201928 Aug 201928 Aug 2019
Please refer to the scope of work for further details pertaining to this package.
Water Tanks07 Aug 201928 Aug 201928 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Compressed Air System08 Aug 201929 Aug 201929 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Fire Water Pumps08 Aug 201929 Aug 201929 Aug 2019
Please refer to scope of work for further details pertaining to this package.
Steel Tanks09 Aug 201930 Aug 201930 Aug 2019
Please refer to scope of work pertaining to this package.
Car Hire13 Aug 201903 Sep 201903 Sep 2019
Please refer to scope of works for further details pertaining to this package
Dam Pumps13 Aug 201903 Sep 201903 Sep 2019
Please refer to scope of work for further details pertaining to this package.
LV Motors16 Aug 201906 Sep 201906 Sep 2019
Please review the scope of works documents for details of the package.
LV VSD Switchroom Mounted16 Aug 201906 Sep 201906 Sep 2019
Please refer to scope of works for further information pertaining to this package.
Isolation Gates19 Aug 201909 Sep 201909 Sep 2019
Please refer to scope of work for more information pertaining to this package.
Vibrating Feeders19 Aug 201909 Sep 201909 Sep 2019
Please refer to scope of work for further details pertaining to this package.
Module Fabrication20 Aug 201910 Sep 201910 Sep 2019
Please refer to scope of work for further details pertaining to this package.
11kV Motor Control Centres21 Aug 201911 Sep 201911 Sep 2019
Please refer to scope of works for further details pertaining to this 11KV MCC's package.
Low Profile Feeders27 Aug 201917 Sep 201917 Sep 2019
Please refer to SOW for further details pertaining to this package.
Product Baghouse Conveyors27 Aug 201917 Sep 201917 Sep 2019
Please refer to SOW for further details pertaining to this package.
Rock Breakers27 Aug 201917 Sep 201917 Sep 2019
Please refer to SOW for further details pertaining to this package.
Conveyor Skirts28 Aug 201918 Sep 201918 Sep 2019
Please refer to SOW for further details pertaining to this package.
Detailed Earthworks and Concrete28 Aug 201918 Sep 201918 Sep 2019
Please refer to SOW for further details pertaining to this package.
HV Motors28 Aug 201918 Sep 201918 Sep 2019
Please refer to SOW for further details pertaining to this package.
Conveyor Idlers23 Aug 201920 Sep 201920 Sep 2019
Please refer to SOW for further details pertaining to this package.
Production Shed02 Sep 201923 Sep 201923 Sep 2019
Please refer to SOW for further details pertaining to this package.
Sample Stations02 Sep 201923 Sep 201923 Sep 2019
Please refer to SOW for further details pertaining to this package.
Mechanical Valves03 Sep 201924 Sep 201924 Sep 2019
Please see SOW for further details pertaining to this package.
Conveyor Belts04 Sep 201925 Sep 201925 Sep 2019
Please refer to SOW for further details pertaining to this package.
Conveyor Pulleys04 Sep 201925 Sep 201925 Sep 2019
Please refer to SOW for further details pertaining to this package.
Laboratory re Port05 Sep 201926 Sep 201926 Sep 2019
Please refer to SOW pertaining to this package.
Analysers13 Sep 201904 Oct 201904 Oct 2019
Please refer to SOW for further details pertaining to this package.
Control Valves13 Sep 201904 Oct 201904 Oct 2019
Please refer to SOW for further details pertaining to this package.
Instrumentation13 Sep 201904 Oct 201904 Oct 2019
Please refer to SOW for further details pertaining to this package.
Level Radar and Ultrasonic13 Sep 201904 Oct 201904 Oct 2019
Please refer to SOW for further details pertaining to this package.
Nucleonic Density and Level13 Sep 201904 Oct 201904 Oct 2019
Please refer to SOW for further details.
Concrete Supply17 Sep 201908 Oct 201908 Oct 2019
Please refer to SOW for further details pertaining to this package.
Weightometers23 Sep 201914 Oct 201914 Oct 2019
Please refer to the scope of works document for details of the package
Grinding Media24 Sep 201915 Oct 201915 Oct 2019
Please refer to SOW for further details pertaining to this package.
Metal Detectors24 Sep 201915 Oct 201915 Oct 2019
Please refer to SOW for further details pertaining to this package.
33kV Switchrooms and 33kV Switchgear07 Oct 201928 Oct 201928 Oct 2019
Please refer to scope of work for further details pertaining to this package.
Switchrooms UPS and 400V MCC07 Oct 201928 Oct 201928 Oct 2019
Please refer to scope of work for further details pertaining to this package.
Transformers07 Oct 201928 Oct 201928 Oct 2019
Please refer to scope of work for further details pertaining to this package.
Freight and Logistics08 Oct 201929 Oct 201929 Oct 2019
Please refer to scope of work for further details pertaining to this package.
Installation HV Infrastructure 33KV Retic and Underground Services17 Oct 201907 Nov 201907 Nov 2019
Please refer to scope of work for further details pertaining to this package.
Installation HV Infrastructure - Earthing Grid And Overhead Distribution18 Oct 201908 Nov 201908 Nov 2019
Please review the scope of works document for details of the package
Iron Bridge NPI24 Oct 201914 Nov 201914 Nov 2019
Please refer to SOW for further details pertaining to this work.
Pipe Process Plant06 Nov 201928 Nov 201928 Nov 2019
Please refer to Scope of Work for further details pertaining to this package.
West Canning Basin Earthworks08 Nov 201928 Nov 201928 Nov 2019
Please refer to SOW for further details pertaining to this package.
Laboratory re Plant01 Nov 201929 Nov 201929 Nov 2019
Please refer to SOW for further details pertaining to this package.
Structural Mechanical Piping Electrical and Instrumentation re PORT08 Nov 201929 Nov 201929 Nov 2019
Please refer to SOW for further details pertaining to this package.
Cable18 Nov 201909 Dec 201909 Dec 2019
Please refer to SOW for further details pertaining to this package.
Cable Tray18 Nov 201909 Dec 201909 Dec 2019
Please refer to SOW for further details pertaining to this work.
Pre-Cast Concrete26 Nov 201917 Dec 201917 Dec 2019
Please refer to the Scope of Works document for details of the package.
Field MCC and Field DB27 Nov 201920 Dec 201920 Dec 2019
Please refer to the scope of works document for details of the package.
Lights and Poles27 Nov 201920 Dec 201920 Dec 2019
Please refer to the scope of works document for details of the package.
Geophysical Logging Services17 Dec 201910 Jan 202010 Jan 2020
Please refer to SOW for further details pertaining to SOW.
Iron Bridge Project RC Drilling17 Dec 201910 Jan 202010 Jan 2020
Please refer to SOW for further details pertaining to this package.
Control System Hardware10 Jan 202031 Jan 202031 Jan 2020
Please refer to SOW for further details pertaining to this package.
Site Offices PORT10 Jan 202031 Jan 202031 Jan 2020
Please refer to SOW for further details pertaining to this package.
Central Control Room (CCR) EIC Equipment22 Jan 202012 Feb 202012 Feb 2020
Please refer to SOW for further information pertaining to this package.
PCS Hardware Software and Integration22 Jan 202012 Feb 202012 Feb 2020
Please see SOW for further details pertaining to this package.
Steel Pipe - Canning Basin30 Jan 202020 Feb 202020 Feb 2020
Please refer to SOW for further details pertaining to this package.
Steel Pipe - Concentrate Line30 Jan 202020 Feb 202020 Feb 2020
Please refer to SOW for further details pertaining to this package.
Steel Pipe - Return Water30 Jan 202020 Feb 202020 Feb 2020
Please refer to SOW for further details pertaining to this package.
CCTV System30 Jan 202021 Feb 202021 Feb 2020
Please refer to SOW for further details pertaining to this package.
Fire Detection System Integration30 Jan 202021 Feb 202021 Feb 2020
Please refer to SOW for further details on this package.
Inspection and Expediting Services04 Feb 202025 Feb 202025 Feb 2020
Please refer to SOW for further details.
Dry Plant Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
Please refer to SOW for further details pertaining to this package.
Port Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
Please refer to SOW for further details pertaining to this package.
Wet Plant Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
Please refer to SOW for further details pertaining to this package.
Mining Operations Explosives Supply and Services06 Feb 202027 Feb 202027 Feb 2020
Please refer to SOW for further details pertaining to this package.
Diamond Drilling Services12 Feb 202004 Mar 202004 Mar 2020
Please refer to SOW for further details pertaining to this package.
Drilling Consumables17 Feb 202009 Mar 202009 Mar 2020
Please refer to SOW for further details pertaining to this package.
OTR Tyres and Rims04 Mar 202026 Mar 202026 Mar 2020
Please refer to SOW for further details pertaining to this package.
Accommodation Port12 Mar 202003 Apr 202003 Apr 2020
Please refer to the scope of works document for details of the package
Canning Basin Raw Water Pipeline23 Mar 202014 Apr 202014 Apr 2020
Please refer to SOW for further details pertaining to this package.
Concentrate and Return Water Pipelines23 Mar 202014 Apr 202014 Apr 2020
Please refer to SOW for further details pertaining to this package.
Flexible Pressure Pipe - Canning Basin23 Mar 202014 Apr 202014 Apr 2020
Please refer to SOW for further details pertaining to this package.
Wedgefield Laydown01 Apr 202022 Apr 202022 Apr 2020
Please refer to SOW for further details pertaining to this package.
Mobile Cranes15 Apr 202006 May 202006 May 2020
Please see the SOW for further details pertaining to this package.
Pipelines Geotechnical Services23 Apr 202015 May 202015 May 2020
Please refer to SOW for further details pertaining to this package.